Environmental and Social Management…
Australia Pacific LNG's Environmental Management Plans
Combabula Environmental Management Plan
- Combabula Environmental Management Plan – Revision 1 (25.8MB)
- Attachment 1 - Blocks and sub-blocks (46KB)
- Attachment 2 - Properties within the Combabula development area (35KB)
- Attachment 3 – Hydraulic fracturing environmental assessment (1.7MB)
- Attachment 4 - Internal constraint planning and development protocols (807KB)
- Attachment 5 - Grievance and dispute resolution policy (109KB)
- Attachment 6 - Gas fields supplementary air quality impact assessment (2.31MB)
- Attachment 7 - Atmospheric dispersion modelling methodology (118KB)
- Attachment 8 - GHG emission estimation methodology (66KB)
- Attachment 9 - Soils management procedure (3.68MB)
- Attachment 10 - Land contamination management procedure (75KB)
- Attachment 11 - Terrestrial ecology data (142KB)
- Attachment 12 - Threatened flora management plan (3.25MB)
- Attachment 12 - Threatened fauna management plan (3.7MB)
- Attachment 12 - Threatened fauna management plan addendum (57.8MB)
- Attachment 13 - Environmental offset strategy (146KB)
- Attachment 14 - Matters of national environmental significance (29KB)
- Attachment 15 - Weed management procedure (381KB)
- Attachment 15 – Vehicle weed hygiene procedure (322KB)
- Attachment 16 - Gas fields' noise impact assessment (9.39MB)
- Attachment 17 – Noise constraints plan (145KB)
- Attachment 18 - Gas fields' noise impact assessment - Supplemental information (6.22MB)
- Attachment 19 - CSG water management plan (15.5MB)
- Attachment 20 - Springs baseflow and groundwater ecosystems - Impact assessment, monitoring and management plan (654KB)
- Attachment 21 - Groundwater monitoring program (717KB)
Condabri Environmental Management Plan
- Condabri Environmental Management Plan (29.5MB)
- Attachment 1 - Blocks and sub-blocks (101KB)
- Attachment 2 - Properties within the Condabri development area (113KB)
- Attachment 3 - Condabri Hydraulic Fracturing Environmental Assessment (28KB)
- Report - Hydraulic Fracturing Environmental Assessment (10.5MB)
- Attachment 4 - Internal constraint planning and development protocols (197KB)
- Attachment 5 - Grievance and dispute resolution policy (138KB)
- Attachment 6 - Gas fields supplementary air quality impact assessment (2.28MB)
- Attachment 7 - Atmospheric dispersion modelling methodology (149KB)
- Attachment 8 - GHG emission estimation methodology (48KB)
- Attachment 9 - Soils management procedure (3.68MB)
- Attachment 10 - Land contamination management procedure (29KB)
- Attachment 11 - Terrestrial ecology data (328KB)
- Attachment 12 - Terrestrial ecology habitat management guidelines (110KB)
- Attachment 13 - Environmental offset strategy (171KB)
- Attachment 14 - Weed management procedure and vehicle hygiene procedure (423KB)
- Attachment 15 - Gas fields' noise impact assessment (9.37MB)
- Attachment 16 - Noise constraints plan (142KB)
- Attachment 17 - Gas fields' noise impact assessment - Supplemental information (6.24MB)
- Attachment 18 - CGS water management plan (10.2MB)
- Attachment 19 - Springs baseflow and groundwater ecosystems - Impact assessment, monitoring and management plan (659KB)
- Attachment 20 - Groundwater monitoring program (731KB)
- Attachment 21 - Matters of national environmental significance (108KB)
Talinga/Orana Environmental Management Plan
- Addendum to Talinga Orana EMP (1.3MB)
- Talinga Environmental Management Plan - Revision 3 (42.4MB)
- Attachment 1 - Environmental Authority (37.4KB)
- Attachment 2 - Blocks and sub-blocks (34KB)
- Attachment 3 - Properties within the Talinga development area (32.9KB)
- Attachment 4A - APLNG Hydraulic Fracturing Environmental Assessment (Cover Page) (34.4KB)
- Attachment 4B - APLNG Hydraulic Fracturing Environmental Assessment Report (14.4MB)
- Attachment 5 - Talinga aquifer injection trial management plan (741KB)
- Attachment 6 - Internal constraint planning development protocols (1.08MB)
- Attachment 7 - Grievance and dispute resolution policy (103KB)
- Attachment 8 - Talinga upgrade air quality impact assessment (557KB)
- Attachment 9 - Atmospheric dispersion modelling methodology (101KB)
- Attachment 10 - GHG emission estimation methodology (48.5KB)
- Attachment 11 - Soils management procedure (3.59MB)
- Attachment 12 - Land contamination management procedure (83.8KB)
- Attachment 13 - Terrestrial ecology data (150KB)
- Attachment 14 - Terrestrial ecology habitat management guidelines (76.8KB)
- Attachment 15 - Environmental offset strategy (143KB)
- Attachment 16 - Matters of national environmental significance (28.6KB)
- Attachment 17 - Weed management procedure and vehicle hygiene procedure (391KB)
- Attachment 18 - Gas fields' noise impact assessment (9.38MB)
- Attachment 19 - Noise constraints plan (143KB)
- Attachment 20 - Octave sound power levels and spectra for noise prediction modelling (39.6KB)
- Attachment 21 - Gas fields' noise impact assessment - Supplemental information (6.22MB)
- Attachment 22 - CSG water management plan (21.6MB)
- Attachment 23 - Springs baseflow and groundwater ecosystems - Impact assessment, monitoring and management plan (659KB)
- Attachment 24 - Groundwater monitoring program (723KB)
LNG Facility Environmental Management Plan
- Volume 1 - Overview Environmental Management Plan (16.4MB)
- Volume 2 - Construction Environmental Management Plan (7.02MB)
- Volume 3 - Operational Environmental Management Plan (4.29MB)
- Appendix A - Acid Sulfate Soil Management Plan (48.3MB)
- Appendix B - Stormwater Management Plan (4.49MB)
- Appendix C - Biosecurity Management Plan (16.7MB)
- Appendix D - Fauna Management Plan (420KB)
- Appendix E - Vegetation Clearing Plan (15.1MB)
- Appendix F - Bushfire Management Plan (14.4MB)
- Appendix G - Environmental Offset Strategy (143KB)
- Appendix H - Mosquito and Midge Management Plan (206KB)
- Appendix I - Marine Mammal and Turtles Management Plan (6.50MB)
- Appendix J - Receiving Environment Management Plan (9.22MB)
- Appendix L - Wastewater Management Plan (3.32MB)
- Appendix M - Greenhouse Gas Management Plan (445KB)
- Appendix N - Waste Management Plan (293KB)
- Appendix O - Social Impact Management Plan (1.01MB)
- Appendix P - Water Supply (3.26MB)
Narrows Crossing Pipeline
- Narrows Crossing Pipeline Environmental Management Plan (15.2MB)
- Attachment 1 - QCLNG Environmental Management Plan Part B Export Pipeline (4.47MB)
- Attachment 2 - QCLNG Narrows Crossing Dredge Management Plan (2.31MB)
- Attachment 3 - Crisis and Emergency Management Directive (899KB)
- Attachment 4 - Incident Management Directive (556KB)
- Attachment 5 - Grievance and Dispute Resolution Policy (99KB)
- Attachment 6 - Noise and Vibration, Lighting and Air Quality Assessment Report (5.13MB)
- Attachment 7 - Narrows Assessment Report (5.21MB)
- Attachment 8 - Environmental Offset Strategy (132KB)
- Attachment 9 - Weed Management Procedure and Vehicle Hygiene Procedure (383KB)
- Attachment 10 - Draft Acid Sulfate Soil Management Plan (9.94MB)
- Attachment 11 - Revised Review of Water Quality in Port Curtis (2.80MB)
- Attachment 12 - Mosquito and Midge Management Plan (234KB)
Main Pipeline
November 2011
- Main Pipeline Environmental Management Plan (2MB)
-
Attachment 1 - Maps
- Main Pipeline Bioregions (413KB)
- Main Pipeline Erosion (8.2MB)
- Main Pipeline Geology (244KB)
- Main Pipeline Good Quality Agricultural Land (799KB)
- Main Pipeline Native Title (659KB)
- Main Pipeline Regional Context (602KB)
- Main Pipeline Registered Groundwater Bores (270KB)
- Main Pipeline Slope (7.7MB)
- Main Pipeline Soils (684KB)
- Attachment 2 - Blocks and Sub-blocks (300KB)
- Attachment 3 - Property Descriptions (78KB)
- Attachment 4 - GHG Emissions (51KB)
- Attachment 5 - Soils Management (1.1MB)
- Attachment 6 - Terrestrial Ecology Datasets (1.7MB)
- Attachment 7 - List of Watercourses (340KB)
- Attachment 8 - Wash Down Facilities (40KB)
December 2010
Amendment Applications
Spring Gully Environmental Authority
Talinga/Orana Environmental Authority
- Addendum to Talinga Orana EMP (1.3MB)
- Talinga Environmental Management Plan - Revision 3 (42.4MB)
- Attachment 1 - Environmental Authority (37.4MB)
- Attachment 2 - Blocks and sub-blocks (34KB)
- Attachment 3 - Properties within the Talinga development area (33KB)
- Attachment 4A - APLNG Hydraulic Fracturing Environmental Assessment (Cover Page) (34KB)
- Attachment 4B - APLNG Hydraulic Fracturing Environmental Assessment Report (14.4MB)
- Attachment 5 - Talinga aquifer injection trial management plan (741KB)
- Attachment 6 - Internal constraint planning and development protocols (1.1MB)
- Attachment 7 - Grievance and dispute resolution policy (103KB)
- Attachment 8 - Talinga upgrade air quality impact assessment (557KB)
- Attachment 9 - Atmospheric dispersion modelling methodology (101KB)
- Attachment 10 - GHG emission estimation methodology (49KB)
- Attachment 11 - Soils management procedure (3.6MB)
- Attachment 12 - Land contamination management procedure (84KB)
- Attachment 13 - Terrestrial ecology data (150KB)
- Attachment 14 - Terrestrial ecology habitat management guidelines (77KB)
- Attachment 15 - Environmental offset strategy (143KB)
- Attachment 16 - Matters of national environmental significance (29KB)
- Attachment 17 - Weed management procedure and vehicle hygiene procedure (391KB)
- Attachment 18 - Gas fields noise impact assessment (9.4MB)
- Attachment 19 - Noise constraints plan (143KB)
- Attachment 20 - Octave sound power levels and spectra for noise prediction modelling (40KB)
- Attachment 21 - Gas fields' noise impact assessment - Supplemental information (6.2MB)
- Attachment 22 - CSG water management plan (32.9MB)
- Attachment 23 - Springs baseflow and groundwater ecosystems - Impact assessment, monitoring and management plan (659KB)
- Attachment 24 - Groundwater monitoring program (723KB)
- Sulphate Amendment Application - Supporting Information (513KB)
- Talinga Environmental Authority Discharge Extension Application (4.6MB)
Combabula, Ramyard and Woleebee Environmental Authority
Condabri Environmental Authority
Social Impact Management Plans
- LNG facility social impact management plan (537KB)
- Gas fields and pipeline social impact management plan (548KB)
About our maps
The Australia Pacific LNG project is required to publish maps showing the maximum or full development scenario for each development phase. Our Environmental Management Plan maps have been prepared to meet these requirements. These will be updated over the life of the project.
Well and pipeline locations are shown for illustrative purposes only.
The actual positioning of all well, pipeline and related infrastructure will be developed in consultation with individual landholders as part of a negotiated development process.
For more information contact 1800 526 369.
