Management plans
EPBC Gas fields approval 2009 4974
- EPBC Gas Fields Annual Environmental Return 2013 (14.7MB)
-
Stage 1 Coal Seam Gas Water Monitoring and Management Plan (1.95MB)
- Appendix A – Subsidence, Aquitard Integrity and Aquifer Interconnectivity Project Plan (525KB)
- Appendix B – Aquifer Injection Feasibility Studies (844KB)
- Appendix C – Groundwater Monitoring Plan (1.5MB)
-
Appendix D – Surface Water Monitoring and Management (4.7MB)
- Appendix A1 – Receiving Environment Monitoring Program Talinga Water Treatment Facility Discharge to Condamine River (1.1MB)
- Appendix A2 – Receiving Environment Monitoring Program Condamine River (2.9MB)
- Appendix A3 – Receiving Environment Monitoring Program Yuleba Creek (2.9MB)
- Appendix C – Assessment of Impact on Narran Lakes Wetland (62KB)
- Appendix E – Treated and Untreated CSG Water Storage and Saline Effluent (Brine) Pond Drawings (6.1MB)
- Appendix F1 – CSG Water Management Plan Talinga (34.5MB)
- Appendix F2 – CSG Water Management Plan Condabri (20.9MB)
- Appendix F3 – CSG Water Management Plan Combabula (15MB)
- Appendix G1 – Saline Effluent Management Plan TalingaOrana (5.6MB)
- Appendix G2 – Saline Effluent Management Plan Condabri Central (5.6MB)
- Appendix G3 – Saline Effluent Management Plan Combabula Central (2.3MB)
- Appendix H – Crisis and Emergency Management Directive (2.4MB)
- Appendix I – Incident Management Directive (353KB)
- Appendix J – CSG Water Quality Monitoring Program Talinga Water Treatment Facility (6.7MB)
- Appendix K – Flowchart Reporting Health and Environment Based Exceedences for Talinga WTF (41KB)
- Appendix L – Walloons Groundwater Monitoring Plan (4.5MB)
- Appendix M – Pond Observation Log Sheet (9KB)
- Appendix N – Emergency Response Plan Talinga Operations and WTF (2.6MB)
- Appendix O1 – Pond Technical Specifications Leak Detection and Recovery System (9.2MB)
- Appendix O2 – Pond Technical Specifications Lining System (210KB)
- Remediation Rehabilitation Recovery and Monitoring Plan (2.2MB)
- Environmental Constraints Planning and Field Development Protocol (635KB)
- EPBC Gas Fields Annual Environmental Return 2012 (391KB)
- Threatened Ecological Community Management Plan Gas Fields (12.9MB)
- Threatened Fauna Management Plan Gas Fields (50.1MB)
- Threatened Flora Management Plan Gas Fields (32.9MB)
- 2013 Groundwater Assessment (28.3MB)
EPBC Pipelines approval 2009 4976
- EPBC Pipeline Annual Environmental Return 2013 (10.1MB)
- Narrows Environmental Management Plan - Terrestrial (15MB)
-
Narrows Environmental Management Plan - Marine
These plans were prepared by QCLNG and approved by the Department of Sustainability, Environment, Water, Population and Communities to meet the approval requirements of both proponents (QGC and Australia Pacific LNG). In order to reduce environmental impacts, QGC and Australia Pacific LNG agreed to construct a bundled crossing and QGC is managing the construction of the Narrows Crossing on behalf of Australia Pacific LNG.
- QCLNG Narrows Dredge Management Plan (32.8MB)
- QCLNG Whole of Project Migratory Shorebird Management Plan (3.8MB)
- QCLNG Significant Species Management Plan Narrows Crossing (5.8MB)
- QCLNG Environmental Management Plan Water Mouse (Xeromys myoides) (3.0MB)
- QCLNG Environmental Management Plan Acid Sulfate Soils (4.4MB)
- QCLNG Condition Compliance Statement and Environmental Management Plan Narrows Bundled Crossing (2.5MB)
- Cycas megacarpa Management and Translocation Plan (5.6MB)
-
Aquatic Values Management Plan Ver 2 (6.25MB)
- Appendix A - Site Assessment Sheets Part 1 (12.7MB)
- Appendix A - Site Assessment Sheets Part 2 (32.7MB)
- Appendix A - Site Assessment Sheets Part 3 (13.9MB)
- Appendix A - Site Assessment Sheets Part 4 (13.0MB)
- Appendix B - Cockatoo Creek Plan (1.26MB)
- Appendix C - HDD constraints (258KB)
- Appendix D - Construction Schedule (31.2KB)
- Aquatic Values Survey Report (24.2MB)
- Threatened Ecological Communities Management Plan Pipeline Ver 2 (6.9MB)
- EPBC Pipeline Annual Environmental Return 2012 (345KB)
- Threatened Fauna Management Plan Pipeline Ver 4 (84MB)
- Threatened Flora Management Plan Pipeline Ver 2 (13MB)
EPBC LNG Facility approval 2009 4977
- EPBC LNG Facility Annual Environmental Return 2013 (409KB)
- Appendix C - Biosecurity Management Plan LNG Facility (6.6MB)
- Migratory Shorebirds Management Plan (2.6MB)
- LNG Facility Volume 2 - Construction Environmental
- LNG Facility Volume 2 - Construction Environmental Management (Rev 12) (30MB)
- LNG Facility Volume 2 - Construction Environmental Management Plan (Rev 16) (26MB)
- Shipping Activity Management Plan (2MB)
- EPBC LNG Facility Annual Environmental Return 2012 (305KB)
EPBC Ruby Spur Pipeline Approval 2011 6221

