Management plans

EPBC Gas fields approval 2009 4974
- EPBC Gas Fields Annual Environmental Return 2021 (442KB)
- EPBC Gas Fields Annual Environmental Return 2020 (648KB)
- EPBC Gas Fields Annual Environmental Return 2019 (480KB)
- EPBC Gas Fields Annual Environmental Return 2018 (670KB)
- EPBC Gas Fields Annual Environmental Return 2017 (648KB)
- EPBC Gas Fields Annual Environmental Return 2016 (648KB)
- EPBC Gas Fields Annual Environmental Return 2015 (300KB)
- EPBC Gas Fields Annual Environmental Return 2014 (800KB)
- EPBC Gas Fields Annual Environmental Return 2013 (14.6MB)
- Stage 1 Coal Seam Gas Water Monitoring and Management Plan (1.95MB)
- Appendix A – Subsidence, Aquitard Integrity and Aquifer Interconnectivity Project Plan (525KB)
- Appendix B – Aquifer Injection Feasibility Studies (844KB)
- Appendix C – Groundwater Monitoring Plan (1.5MB)
- Appendix D – Surface Water Monitoring and Management (4.7MB)
- Appendix A1 – Receiving Environment Monitoring Program Talinga Water Treatment Facility Discharge to Condamine River (1.1MB)
- Appendix A2 – Receiving Environment Monitoring Program Condamine River (2.9MB)
- Appendix A3 – Receiving Environment Monitoring Program Yuleba Creek (2.9MB)
- Appendix C – Assessment of Impact on Narran Lakes Wetland (62KB)
- Appendix E – Treated and Untreated CSG Water Storage and Saline Effluent (Brine) Pond Drawings (6.1MB)
- Appendix F1 – CSG Water Management Plan Talinga (34.5MB)
- Appendix F2 – CSG Water Management Plan Condabri (20.9MB)
- Appendix F3 – CSG Water Management Plan Combabula (15MB)
- Appendix G1 – Saline Effluent Management Plan TalingaOrana (5.6MB)
- Appendix G2 – Saline Effluent Management Plan Condabri Central (5.6MB)
- Appendix G3 – Saline Effluent Management Plan Combabula Central (2.3MB)
- Appendix H – Crisis and Emergency Management Directive (2.4MB)
- Appendix I – Incident Management Directive (353KB)
- Appendix J – CSG Water Quality Monitoring Program Talinga Water Treatment Facility (6.7MB)
- Appendix K – Flowchart Reporting Health and Environment Based Exceedences for Talinga WTF (41KB)
- Appendix L – Walloons Groundwater Monitoring Plan (4.5MB)
- Appendix M – Pond Observation Log Sheet (9KB)
- Appendix N – Emergency Response Plan Talinga Operations and WTF (2.6MB)
- Appendix O1 – Pond Technical Specifications Leak Detection and Recovery System (9.2MB)
- Appendix O2 – Pond Technical Specifications Lining System (210KB)
- Stage 2 Coal Seam Gas Water Monitoring and Management Plan (40MB)
- Remediation Rehabilitation Recovery and Monitoring Plan (2.2MB)
- Environmental Constraints Planning and Field Development Protocol (601KB)
- EPBC Gas Fields Annual Environmental Return 2012 (391KB)
- Threatened Ecological Community Management Plan Gas Fields (12.9MB)
- Threatened Fauna Management Plan Gas Fields (50.1MB)
- Threatened Flora Management Plan Gas Fields (32.9MB)
- 2013 Groundwater Assessment (5MB)
- 2013-2014 Groundwater Assessment (78MB)
- 2014-2015 Groundwater Assessment (45MB)
- 2015-2016 Groundwater Assessment (35MB)
- 2016-2017 Groundwater Assessment (25MB)
- 2017-2018 Groundwater Assessment (19MB)
- 2018-2019 Groundwater Assessment (19MB)
- EPBC Gas Fields Independent Audit Report 2015 (2.4MB)
- EPBC Gas Fields Independent Audit Report 2016 (2.4MB)
- 2015 Annual Receiving Environment Monitoring Program - Condamine River (18.71MB)
- 2015 Annual Receiving Environment Monitoring Program - Yuleba Creek (5.85MB)
EPBC Pipelines approval 2009 4976
- Annual Environmental Return EPBC 2021 (403KB)
- Annual Environmental Return EPBC 2020 (515KB)
- Annual Environmental Return EPBC 2019 (640KB)
- Annual Environmental Return EPBC 2018 (642KB)
- Annual Environmental Return EPBC 2017 (605KB)
- Annual Environmental Return EPBC 2016 (9.1MB)
- EPBC Pipeline Annual Environmental Return 2015 (430KB)
- EPBC Pipeline Annual Environmental Return 2014 (10MB)
- EPBC Pipeline Annual Environmental Return 2013 (10.1MB)
- EPBC Pipeline Annual Environmental Return 2012 (345KB)
- Cycas megacarpa Management and Translocation Plan (Rev8) (5.4MB)
- Aquatic Values Management Plan Ver 2 (6.25MB)
- Appendix A - Site Assessment Sheets Part 1 (12.7MB)
- Appendix A - Site Assessment Sheets Part 2 (32.7MB)
- Appendix A - Site Assessment Sheets Part 3 (13.9MB)
- Appendix A - Site Assessment Sheets Part 4 (13.0MB)
- Appendix B - Cockatoo Creek Plan (1.26MB)
- Appendix C - HDD constraints (258KB)
- Appendix D - Construction Schedule (31.2KB)
- Aquatic Values Survey Report (24.2MB)
- Threatened Ecological Communities Management Plan Pipeline Ver 3 (6.0MB)
- Threatened Fauna Management Plan Pipeline Ver 4 (84MB)
- Threatened Flora Management Plan Pipeline Ver 3 (8.9MB)
- Joint Proponent Offset Proposal (80MB)
- LNG Tank Hydrostatic Discharge Management Plan (600KB)
- Narrows Environmental Management Plan - Terrestrial (15MB)
- Main Pipeline Environmental Management Plan (25.6MB)
The following plans were prepared by QCLNG and approved by the Department of Environment (former Department of Sustainability, Environment, Water, Population and Communities) to meet the approval requirements of both proponents (QGC and Australia Pacific LNG). In order to reduce environmental impacts, QGC and Australia Pacific LNG agreed to construct a bundled crossing and QGC is managing the construction of the Narrows Crossing on behalf of Australia Pacific LNG.
- Condition Compliance Statement and Narrows Crossing Environmental Management Plan
- Export Pipeline (Narrows Crossing - Marine Section) Environmental Management Plan Part B
- Dredge Management Plan
- Export Pipeline The Narrows Crossing Aquatic Values Management Plan
- Acid Sulfate Soils Environmental Management Plan
- Significant Species Management QCLNG Export Pipeline - Narrows Crossing
- Environmental Management Plan Water Mouse (Xeromys myoides)
- Whole of Project Migratory Shorebirds Management Plan
Current versions of these management plans can be found on QGC’s website
EPBC LNG Facility approval 2009 4977
- Construction Rehabilitation Plan (743KB)
- Water Mouse Management Plan (1.5MB)
- Receiving Environment Monitoring Program (4.5MB)
- Commissioning and Start-Up Management Plan (2.4MB)
- EPBC LNG Facility Annual Return 2021 (850KB)
- EPBC LNG Facility Annual Return 2020 (1.1MB)
- EPBC LNG Facility Annual Return 2019 (1.1MB)
- EPBC LNG Facility Annual Return 2018 (547KB)
- EPBC LNG Facility Annual Return 2017 (628KB)
- EPBC LNG Facility Annual Return 2016 (482 KB)
- EPBC LNG Facility Annual Return 2015 (460KB)
- EPBC LNG Facility Annual Return 2014 (420KB)
- EPBC LNG Facility Annual Environmental Return 2013 (409KB)
- EPBC LNG Facility Annual Environmental Return 2012 (305KB)
- Biosecurity Management Plan (2MB)
- Migratory Shorebirds Management Plan (1.5MB)
- Caspian Tern, Crested Tern, Gull-billed Tern Species Tern Management Plan (1.1MB)
- LNG Facility Volume 2 - Construction Environmental Management (Rev 12) (30MB)
- LNG Facility Volume 2 - Construction Environmental Management Plan (Rev 16) (26MB)
- Shipping Activity Management Plan (1.9MB)
- Joint Proponent Offset Proposal (80MB)
- LNG Tank Hydrostatic Discharge Management Plan (600KB)
- Construction Shipping Activity Management Plan (3MB)
- Australia Business Unit East LNG Facility (Curtis Island) Operational Environmental Management Plan (3.7MB)
The following plan was prepared by QCLNG and approved by the Department of Environment (former Department of Sustainability, Environment, Water, Population and Communities) to meet the approval requirements of three proponents (QGC, Santos GLNG and Australia Pacific LNG).
EPBC Ruby Spur Pipeline Approval 2011 6221
- Annual Environmental Return EPBC 2011 6221 2021
- Annual Environmental Return EPBC 2011 6221 2020
- Annual Environmental Return EPBC 2011 6221 2019
- Annual Environmental Return EPBC 2011 6221 2018
- Annual Environmental Return EPBC 2011 6221 2017
- Annual Environmental Return EPBC 2011 6221 2016
- Annual Environmental Return EPBC 2011 6221 2015
- Annual Environmental Return EPBC2011 6221 2014
- Ruby Spur Species Management Plan
EPBC Alfredson Block Approval 2017 7902
EPBC Spring Gully North East & North West Approval 2017 7881
Pipelines Environmental Authority Requirements
- Eastern High Pressure Gas Network - Aquatic Values Management Plan (12.1MB)
- Western High Pressure Gas Network – Aquatic Values Survey Report (Rev 2) (120MB)